Mashhad Subway Line 2 Signalling

  This Project is an EPC(Engineering,Procurement,Construction) Project in Signaling ; of which it has been performed on Line 2 Mashhad Subway as long as 13 km for 13 stations.
Main Signaling subsystems of this project including:
SIGNALING
OPTICAL FIBER 

Newsletter