Localization of the interlocking system

The process of laboratory evaluation of this system was carried out in close cooperation with the rail company on the basis of a comprehensive and progressive process. Based on this process, all the functional, qualitative and validation tests were completed in full. Also Reliability calculations of this system were carried out using accelerated tests as a scientifically valid methodology. It is stipulated that this system should be installed at the Tarbiat Moalem Station in the Azerbayejan area fully and be evaluate with field testing. The project is also underway.