Mashhad Urban Railway Corporation, Line 1
Daily transportation capacity : up to 170 million passengers in 16-hour operation
Equivalent to 15.5 km tunnel, 8.5 km interchange
Operational: 19.5 km with 22 stations
Path length: 24 km with 24 stations
13 Subway stations, 11 interchange stations
Mashhad Urban Railway Line 1 Development:
It is developing along the line 1.
Path length: 4.5 km
Number of stations: 2 stations (flight and airport)
Structure features of the route: shallow underground tunnel
HISTACO has been the EPC contractor for Automatic Fare Collection system.